Work: SHIPPING PORT OVER THE PARANA RIVERDetail
TURNKEY construction of the Preparation Building
Metal structure: 2.000 tonsReinforced concrete: 5.000 m3Enclosures: 18.000 m²Architecture works, floors, exterior pavements, auxiliary works.