Work: SHIPPING PORT OVER THE PARANA RIVER
Detail
TURNKEY construction of the Preparation Building
Metal structure: 2.000 tons
Reinforced concrete: 5.000 m3
Enclosures: 18.000 m² omega replique
Architecture works, floors, exterior pavements, auxiliary works.