Work: OIL PLANT
Detail:
TURNKEY construction of the Preparation Buildings, Ben Heater, Boilers, Pre-cleaning and Drying
Metal structure: 1.200 tons
Reinforced concrete: 8.500 m3
Enclosures: 15.000 m²
Architecture works, floors, exterior pavements, auxiliary works