CENTRAL GUILLERMO BROWN

Client:  SIEMENS S.A.

Work:  THERMOELECTRIC STATION (work in construction process)

Surface:  5.600 m²
 

Detail:

Construction of the metal Turbines Building and joined buildings

Metal structure: 1.600 tons

Enclosures: 11.600 m²

  • Location: Bahía Blanca, Buenos Aires
  • Surface: 5.600 m²