CENTRAL VUELTA DE OBLIGADO

Client:  FAINSER S.A.

Work
:  THERMOELECTRIC STATION (work in construction process)


Detail:

Construction of the metal building and equipments supporting structures
Metal structure: 1.700 tons
Enclosures: 12.500 m²

  • Location: Timbúes , Santa Fe
  • Surface: 3.600 m²