Work: E9 BUILDING CONSTRUCTION, EXPANSION OF THE ENGINE ASSEMBLY LINE BUILDING
Surface: 3.000 m²
Detail:
TURNKEY Project and Construction
Earthwork. Civil engineering works.
Metal structures with masonry and metal enclosures.
Interior and exterior pavements.
Fire- fighting installation.
Storm and industrial drains.