Depósitos Frigoríficos

P&O Cool Queen public cold store

Project

Cinter carried out the comprehensive construction of a modern refrigerated warehouse within the Central Market logistics complex, intended for the operation of fresh and frozen products under the highest standards of thermal control. The project included a large area warehouse, developed with a high-capacity metal structure and special envelopes to ensure energy efficiency and maximum thermal insulation. The building incorporates cold chambers, high-density storage areas, loading docks for continuous operation and industrial refrigeration systems designed to ensure the cold chain at all times. Service sectors, technical areas and complementary infrastructure were also integrated, allowing for safe, agile and efficient operation. Thanks to its experience in “turnkey” solutions, Cinter developed a refrigerated logistics center designed to accompany the growth of the food sector and guarantee reliable, stable and highly operational storage and distribution processes.

Customer

P&O Cool Queen

Sector

Depósitos Frigoríficos

Location

Mercado Central, Buenos Aires

Surface

12.500 m2

Metal Structures

350 Tn

Scope of the Project

  • Soil movement.
  • Complete civil works (foundations, floors, partitions, etc.)
  • Covered Structures.
  • Enclosures.
  • Partitions and ceilings.
  • Automatic cooling system.
  • Installation of electromotive force and lighting.
  • Fire protection system installation.
  • Shelves for 16,500 pallet positions.
  • Full charging docks.
  • Refrigerated doors.
  • Quick-drive doors.
  • Offices and services.
No items found.

Let's work together to build